DESIGN, CONSTRUCTION AND EQUIPMENT OF A WATER TREATMENT PLANT (WTP)
Saurimo (Angola)
The goal of this project is the design, construction and equipping of a new water treatment plan (WTP) to supply the city of Saurimo with drinking water, to meet the consumption demands of a population of ~600k, the WTP needs to have 60,000 m3 capacity. The project includes the following scope: water intake; raw water transmission network; new WTP; new water distribution centres and water transmission network.
CONTRACTING AUTHORITY
Ministry of Health
Government of Angola
INVOLVED PARTIES
Sinohydro
Main contractor -
Technological Partner
Quantum
Subcontractor
Standard bank
Financing agent